Rapid Dry Envelope

In multi-storey developments, MBS light steel framing creates a rapid dry envelope to support the external cladding and internal plasterboard. Rapid installation of the light steel frame ensures the buildings are enclosed earlier, enabling finishing work and internal fit-out to proceed. Fast construction can save weeks on critical site programmes.

High acoustic and thermal values are possible as the 'warm-frame' construction enables additional and improved performance through a variety of insulation boards on both external and internal walls.

MBS frames are much lighter than blockwork or other masonry materials, which is a necessity on renovation projects where heavy line loads are unable to be carried by the existing floors.

  • Weather tight envelope allows internal fit-out to proceed earlier
  • Fewer materials and less labour are required on site
  • Dry process lessens risk of movement through shrinkage
  • High acoustic and thermal values
  • Lightweight - suitable for 'brown-field' sites
  • Ideal for renovation projects where existing structure is not sufficient to support heavy loads
  • Can be used to construct walls up to 7m high
  • Can support lightweight cladding materials
  • Can be used for housing, education, cinemas, hospitals and renovation.